# By 2028, data centers take up to 12% of US electricity; 40% of AI data centers power-stalled by 2026

- **Speaker:** Greg Osuri
- **Attribution:** attributed
- **Said:** 2025-11-04
- **Theme:** Energy &amp; AI — https://www.gregosuri.com/predictions/energy-ai/
- **Source:** Sponsored Session: Powering PyTorch: Decentralized Training for an Energy-Hungry Future - Greg Osuri (PyTorch)
- **Watch at:** 00:02:11 — https://www.youtube.com/watch?v=T3nA1nAaLss&t=131s
- **Canonical:** https://www.gregosuri.com/predictions/energy-ai/2025-11-04-by-2028-data-centers-take-up-to-12-of-us-electrici-rbpl/
- **Cite as:** Greg Osuri, "By 2028, data centers take up to 12% of US electricity; 40% of AI data centers power-stalled by 2026," Sponsored Session: Powering PyTorch: Decentralized Training for an Energy-Hungry Future - Greg Osuri (PyTorch), 4 Nov 2025, 00:02:11. https://www.youtube.com/watch?v=T3nA1nAaLss&t=131s

## Quote — verbatim

> The US Department of Energy report estimates US data centers consumed about 176 terawatt hours in 2023 — about 4.4% of US electricity. By 2028, the range is 325 to 580 terawatt hours, or 6.7% to 12% of US electricity. At the high end, that's 1 in 8 watts on the grid going to data centers... Analysts are warning by 2026, 40% of AI data centers could be stuck waiting for power, even as some facilities spin up diesel at peak to stay online.

## Context — site annotation, not spoken

The quantified energy case; he adds global data center electricity "could approach about 945 terawatt hours by 2030."