# GPT-6/7 will be trained by a nuclear-powered data center

- **Speaker:** Greg Osuri
- **Attribution:** attributed
- **Said:** 2025-08-02
- **Theme:** Energy &amp; AI — https://www.gregosuri.com/predictions/energy-ai/
- **Source:** Solving the AI energy crisis \| Greg Osuri on what it takes to power AI (Changelog)
- **Watch at:** 00:11:00 — https://www.youtube.com/watch?v=61OOQfY5cqU&t=660s
- **Canonical:** https://www.gregosuri.com/predictions/energy-ai/2025-08-02-gpt-6-7-will-be-trained-by-a-nuclear-powered-data-ceg6/
- **Cite as:** Greg Osuri, "GPT-6/7 will be trained by a nuclear-powered data center," Solving the AI energy crisis \| Greg Osuri on what it takes to power AI (Changelog), 2 Aug 2025, 00:11:00. https://www.youtube.com/watch?v=61OOQfY5cqU&t=660s

## Quote — verbatim

> The amount of energy we need to train state-of-the-art models... is doubling every two years. Right now the OpenAI data center that's operational in Texas draws about 300 megawatts of capacity. So doubling that means by 2030 we'll need a nuclear reactor at the minimum to train the state-of-the-art model. So ChatGPT 6 or 7 is going to be a nuclear-powered data center.

## Context — site annotation, not spoken

Based on his analysis of training-energy data back to 2013; a quantified forecast on training-run energy scaling.
